PRODUCT

From “which rules reach me?” to “this will pass.”

The work of a specialist compliance department, sequenced into one loop between an EU buyer and a non-EU supplier: find the exposure, collect the data once, test the evidence, run the tasks that follow.

seven moves · one loop · nine regulations

The loop closes. That is the whole product.

Each move hands the next one something it can use. Nothing is collected twice, and nothing is declared until it has been tested.

BUYER
SUPPLIER
01Exposure
Which of the nine reach this product, this trade lane.
deterministic rules, no AICN/HSmaterialspackagingbatteryEEE3TGmarketsmanual reg-addConflict Minerals and Scope 3 confirm only on buyer invite
SPANS BOTH LANES · EITHER PARTY CAN RUN IT
02Buyer requests
The ask leaves as named work, not “please send documents”.
82 obligation steps, each with the actor who owes itone-off / per shipment / annual / event-driven
03Guided entry
The gap becomes a fillable, trackable task.
plain language, no legal textunit conversionprogress per regulation
04Collect once
One dataset per product, reused by every regulation that wants it.
69 data points across 8 domainskeyed by data point, never by regulationgenuine / partial / false overlap
05Sufficiency
Element by element: does this evidence actually satisfy the rule?
81 requirement checkspass / gap / not provideddocument typecompletenessformatunitthreshold basissufficiency, not truthfulness
06Pack assembled
The artifact the regulation names — not a folder of near-misses.
CMRTIPC-1752A / IEC 62474 XMLEUDR DDS field setGHG-Protocol PCFPDF + CSVsubmission-ready, not auto-filed
07Buyer status
Per supplier, per regulation, current — and it feeds 01 again.
per supplier, per regulationcompletion and gap countsfeeds exposure again
HANDS TO SUPPLIER
BACK TO BUYER
03 – 06 RUN IN THE SUPPLIER LANE
KNOWLEDGE HUB
present at every question.
inline at every questionverified from primary legal textsENTRFRNLUArephrases and translates only
RUNS ALONGSIDE
03 – 06
07 FEEDS 01 · THE EXPOSURE MAP UPDATES WHEN STATUS CHANGES
buyer lane left · supplier lane right · the crossings are where the work changes hands
THE THREE THAT ARE OURS

A folder of PDFs can’t do these three things.Mappliance does.

01 — OVERLAP ANALYSIS

No more audit fatigue. Answer once, use it nine times.

The platform knows where nine regulations ask the same question, so the supplier answers it once.

OVERLAP MAP · 3 PRODUCTS
PRODUCTCBAMREACHRoHSPPWRSC.3Hot-rolled coilCold-drawn barFastener kit
SHARED DATA POINTMaterial composition — asked by REACH, RoHS and PPWR. Collected once.
SUFFICIENCY CHECK · CBAM · HOT-ROLLED COILINSUFFICIENT — 2 GAPS
Installation identity & operatorSUFFICIENT
Production route & CN codeSUFFICIENT
Direct embedded emissions — MRR methodEPD SUBMITTED — WRONG BASIS
Electricity emission factorSUFFICIENT
Verification statement — accredited verifierMISSING
A life-cycle EPD figure does not substitute for MRR-methodology actual emissions. The gap becomes task 05 — with the exact field to fill.
02 — SUFFICIENCY CHECK

Sufficiency, checked before your buyer sees it.

Every element the regulation names is tested separately, and a near-miss document is called what it is.

03 — KNOWLEDGE HUB

AI powered, not AI delivered.

Every answer stays bounded to the verified legal base, with the source article named — the reading a specialist would do, at any hour.

KNOWLEDGE HUB · IN CONTEXT
Direct embedded emissions

The emissions from your own production processes for these goods — measured or calculated for the installation that made them, not an industry average and not a life-cycle figure.

WHERE TO FIND IT
Process monitoring logs, fuel and reductant consumption records for the reporting period.
WHO CONFIRMS IT
An accredited verifier, in a statement the buyer's declarant can rely on.
SOURCE: REG. (EU) 2023/956 ANNEX IV · HUMAN-VERIFIED
Sufficiency checking is being built — the tests exist in the regulation base.
TWO PROFILES · ONE RECORD

Both sides work the same file.

non-EU factory selling into the EUSUPPLIER
THE SHARED RECORD
BUYEREU importer or manufacturer
Answers once, in plain language
Installation identity
DP-ORG-001
Filled — nothing to ask for
Uploads the emissions report
CBAM
Operator’s emissions report
A verdict, not a folder
Sees the gap named before sending
Total embedded emissions
gap
The same gap, per supplier
Reuses it for the next buyer
Material composition
REACH · RoHS · PPWR
Requests only what’s missing
Marks the task done
Art. 33 response
due in 45 days
Deadline and status, live
+ 64 MORE FACTS
9 regulations · 69 data points · 81 checks · one record
on the platform the role is fixed at signup

See it on your products.

A demo runs the loop on your actual products and trade lanes — exposure first, then one sufficiency check you can argue with.